 OPERATION & MAINTENANCE
Rotation of the machine should always be as per the arrow mark shown.
Use the Hammers of equal weights opposite each other to avoid any vibration.
To increase the fineness of the product Whizzer of 2, 4 or 6 Arm to be fitted as per the requirement. Using Whizzer with more number of Arms will give more finer product.
To regulate the fineness, the Whizzer to be adjusted, forward and backward.
If fine mesh is required, push the Whizzer towards the Blower and if coarse mesh is required, vice-versa, i.e. “Whizzer nearer the Disc coarser the Mesh, Whizzer nearer the Blower finer the Mesh”.
Every Nuts & Bolts, pins of the Hammers of the machine to be minutely checked before starting the machine.
Pipe Lines and Cloth Tubes to be cleaned by light hammering.
Grinding Chamber is lined with 12 pcs. Top Liners & 8 pcs. Side Liners and blower Chamber with 17 pcs Liners. It should be replaced if and when required.
   Whizzer section is protected with Single Piece Conetype Liner.
Before starting every day, pour 100 ml. lubricating oil in both the Bearings.
Cleaning of Grinding Chamber and Pipe Lines through the inspection windows to be done once is a week.
Light greasing of Bearings to be done once in a month.
18 number Cloth Tubes fitted in the Cyclonic Cone should be washed and dried once in a month.